Scope of work:

Upgrade 96 unit apartment complex consisting of 4 buildings constructed in 1971 to most efficient heating system while providing domestic hot water at a safe and consistent temperature with the most cost effective and affordable cost possible.

Property owner:

Colorado Coalition for the Homeless
2111 Champa St.
Denver, CO 80205

Location:

Forest Manor Apartments
1400 to 1430 Moline St
Aurora CO 80002

Munchkin
Raypak
Rheem

Existing system:

  • Ajax 850,000 BTUH tube boiler efficiency 67%.
  • Domestic hot water production system a #14 Everhot with a Watts mechanical mixing valve.
  • No hot water storage tank and three handle shower non pressure balanced fixtures.

Solution:  Separate the system with one boiler for heating and one for domestic hot water, with storage.

Equipment selection:

  • Install 1 Munchkin heating boiler at 92% efficient.
  • Install 1 munchkin domestic hot water boiler at 96% efficient.
  • Use wet rotor Taco commercial pumps.


Domestic hot water production cost reduced by 50%
Overall consumption reduced 65%

Project cost:  $148,750.00    Pay back:  5 years and 2 months


NATURAL GAS INCREASED 12% IN JANUARY 2008. IF THE FUEL COST CONTINUES TO ESCALATE AS IS EXPECTED, THE PAY BACK PERIOD COULD BE AS LITTLE AS 3.7 MONTHS TO 4 YEARS. Calculations must be based on each complex's unique circumstances, location, heating system, and operational characteristics.

VIEW OF MUNCHKIN BOILERS WITH 120 GALLON STORAGE TANK

ASK FOR A FREE NO OBLIGATION ENERGY CONSUMPTION AUDIT

CALL WITH ANY QUESTIONS



Rinnai Solutions

Download: R-410A Manual

Download: CFC Certification

eBay

Find great bargains on our online auction!

Services

  • Air cleaners/air purifiers
  • Air Conditioning
  • Backflow Prevention
  • Boilers Hot Water
  • Boilers Steam
  • Building Automation
  • Cooling Towers
  • Energy Star
  • Furnaces
  • Humidification
  • HVAC
  • Pipe Fitting
  • Plumbing
  • Pump Service
  • Solar Energy
  • Steam Rooms
  • Water heaters

Charge Cards

180 Days Same as Cash
With Approved Credit

Your Check is Being Processed Electronically

Each remittance of payment
by check is considered
authorization to convert
that particular check into
an electronic transaction. If
your check is unable to be
converted electronically, it
will be processed as a draft
against your account.

Emergency Service

Service for any emergency is available 24 hours a day, 7 days a week.

Our Office Hours

Our office is open 8:00 AM to 6:00 PM Monday through Friday and 9:00 AM to 1:00 PM on Saturday.

Call  (303) 278-6417

Tip of the Week

Blow down your steam boiler.

Tip: 

All steam boiler manufacturers recommend that the low water cut out be "blown down weekly." How to blow down? When the boiler is steaming (up to operating pressure and temperature) the valve located at the bottom of the low water cut out is opened for 5-7 seconds. With the boiler firing, and the blow down valve open, the burner shuts off and will restart when blow down valve is closed. This verifies safe and correct low water cut out operation and keeps the assembly free of scale and debris. DANGER: THE DISCHARGE WATER TEMPERATURE WILL BE 200 DEGREES F AND CAN CAUSE SEVERE BURNS OR DEATH. USE PROPER PRECAUTIONS. Denver Building code states that the water temperature discharged into the sanitary sewer must not exceed 180 degrees F.

Our Location

1919 West 12th Place
Denver, CO 80204

Find Us

MapQuest

Copyright © 2010 Broomhall Brothers, Inc. Denver Mechanical Contractors. All Rights Reserved.
Powered by Amplio - Denver